Yield, scrap, rework and OEE are defined locally, which makes network comparison a reconciliation exercise.
Operational and Manufacturing Analytics
You Cannot Change the Process Just Because the Data Says You Should
The challenge
In medtech a deviation is not a variance, it is a record
Process change carries a qualification cost
A deviation generates a record, not just a conversation
Equipment data and quality data live apart
Metrics mean different things per site
Production metrics hide quality losses
The build record is the start of every field investigation
Years later somebody needs what the line recorded, in a form nobody designed for that purpose.
Approach
Start with what you can act on without a qualification project
Step 1
Separate improvements requiring a validated process change from those that do not, since the second group is where early value sits.
Step 2
Define KPI rules for production completion, unit acceptance, first pass yield, rework, OEE downtime, ideal cycle time, scrap valuation, product mix and historical definitions.
Step 3
Join equipment data to quality outcomes, which is the correlation most device manufacturers cannot currently make.
Step 4
Establish lot and serial traceability through the process, covered on our data platform page and required by every investigation.
Step 5
Detect drift before it becomes a deviation, since avoiding the record is worth more than explaining it.
Step 6
Model the cost of acting, so prioritization accounts for qualification rather than only for benefit.
Step 7
Keep the device history record intact, because the analytical copy is not the controlled record.
Step 8
Design for the investigation, so manufacturing context is retrievable years later without a reconstruction.
Step 9
Respect the boundary with process control, since analytics reads from the line and does not act on it.
Step 10
Validate the analytics where output supports a quality decision, to the position your quality function defines.
Capabilities
Measure it, correlate it, warn on it, trace it
Measure
Metric Definition and Harmonization
Production Performance Analytics
Quality Cost Analytics
Scrap, rework, investigation effort and disposition time, which is the cost of quality most organizations under-measure.
Equipment Performance Analytics
Correlate and Warn
Process to Outcome Correlation
Drift and Early Warning Detection
Predictive Maintenance Foundations
Root Cause Support
Trace and Govern
Lot and Serial Traceability
Device History Support
Site and Network Comparison
Analytics Governance
What CaliberFocus does, and does not do?
Where it applies
Eight analyses, ranked by whether acting requires requalification
| Analysis | What It Shows | What Acting on It Requires |
|---|---|---|
| Downtime and Changeover | Where line time is lost. | Scheduling and practice changes without process requalification. |
| Scrap and Rework Cost | Quality failure costs by cause. | Improved visibility; most causes can be addressed through existing mechanisms. |
| Maintenance Timing | Whether maintenance is early, late or reactive. | Maintenance schedule changes, generally outside process validation. |
| Material and Supplier Correlation | Whether a lot or supplier correlates with outcomes. | Supplier action, covered on our Document AI and Quality pages. |
| Drift and Early Warning | Parameters trending toward limits. | Intervention within the validated range, offering high value with a low barrier. |
| Equipment Parameter Optimization | Whether alternative settings could improve performance. | Change control and requalification, with real value and cost. |
| Process Design Change | Potential improvements to the process itself. | Full change assessment, validation and documentation. |
Architecture
Six sources, and only two were designed to be analysed
Manufacturing data comes from systems built for execution, control and record keeping rather than for analysis. The third column is what each one demands before it is usable, and underestimating this is why manufacturing analytics programmes take longer than planned.
| Source | What It Holds | What It Demands |
|---|---|---|
| MES | Work orders, operations and build genealogy. | The strongest structured source and the anchor for other systems. |
| Equipment Historians | High-frequency process parameters. | Volume handling, time alignment and linking tags to work orders. |
| QMS | Nonconformances, deviations, CAPA and investigations. | Controlled access and links from records to the relevant build. |
| ERP | Materials, lots, receipts, orders and costs. | Lot genealogy traced to serial numbers, not just work orders. |
| Inspection Systems | Measurements, images and pass/fail results. | Association with individual units, covered on our Vision Inspection page. |
| Paper and Hybrid Records | Records that have not been digitized. | Extraction through our Document AI page and clear reporting of coverage gaps. |
Why Time Alignment Matters
Trust
The analytical copy is not the device history record
Record boundaries
- The controlled device history record remains authoritative, with the analytical layer explicitly a derived copy
- Analysis supporting a quality decision traceable back to the controlled source rather than resting on the copy
- Engineering controls capable of supporting the frameworks that apply, which may include FDA regulation, ISO 13485, GxP expectations and electronic record requirements
- Applicability, interpretation and validation strategy determined by your quality and regulatory functions rather than by us
Traceability
- Lot to serial genealogy maintained, since it determines investigation and field action scope
- Equipment, operator, shift and environmental context associated with the build where recorded
- Historical process state retrievable, because the investigation asks what the line was doing then
- Lineage from any reported figure back to the source records behind it
Governance
- Metric definitions owned and versioned, since a changed definition restates history with no production change
- Site-level variation in definitions surfaced rather than silently averaged in network reporting
- Change to analytical logic governed where output supports a quality decision
- A named owner for the metric set, distinct from whoever built the pipelines
Security
- Industrial network boundaries respected, with data egress rather than platform access into the control environment
- Process parameters and yield data treated as commercially sensitive intellectual property
- Access governed by purpose, since quality investigation and operational reporting are different grants
- Supplier and material cost information protected to the relevant agreements
Metrics and monitoring
Two plants reporting the same yield are probably not measuring the same thing
What to resolve before comparing
Does rework count as a pass
Where is the measurement boundary
How are engineering and validation units treated
What counts as downtime
How is a nonconformance distinguished from a scrap event
What period and what product mix
Outcomes
Fewer records, lower quality cost, comparable numbers
| Category | What We Measure | Why It Matters |
|---|---|---|
| Explain Where the Line Loses Capacity | For one production line, whether you can report scheduled and produced units, first pass acceptance, rework, scrap, lost production time, planned and unplanned downtime, ideal and actual cycle times, bottlenecks, recurring equipment interruptions, material lots linked to failures, capacity consumed by rework, and reconcile production counts with quality dispositions. | If this requires several departments and spreadsheet reconciliation, the opportunity lies in improving that reconciliation. |
| Deviations Avoided | Drift detected and corrected before a specification limit is exceeded. | Preventing a deviation is more valuable than explaining it afterward. |
| Cost of Quality Visibility | Investigation, disposition and CAPA effort quantified alongside scrap. | These costs often exceed material costs and are rarely measured. |
| Definition Convergence | Whether sites calculate core metrics consistently. | Consistent definitions are essential for meaningful network comparisons. |
| Investigation Start Time | Time from a nonconformance to assembling the relevant manufacturing context. | Shows where investigation effort is spent. |
| Actionability Ratio | Insights acted on compared with total insights delivered. | Unaddressed insights erode confidence in the programme. |
Improve manufacturing visibility, product quality and operational performance
Start with one production line.
Security & Compliance
